Donnacona Hydroelectric Project

Client
Hydro-Donnacona Society, S.E.N.C.

Location
Donnacona, Canada

Construction cost
$7,000,000

Year
1996

Services

Environmental study
Preliminary engineering
Plans and specifications
Turnkey project

Description

The Donnacona project on the Jacques-Cartier River is a 4,7 MW installation incorporated in an existing concrete dam. Environmnental mitigation measures for salmon such as fish screens and a fish ladder are included in the project construction.

Particularity

Installed capacity of 4,7 MW with 8 Kaplan turbine groups including 1 double regulated group. Gross head of 7,4 m and a rated power flow of 86 m3/s.